Gallery
Cremation furnace, complete rebuilt, first test run
Refractory Installation
Installation of secondary arch in boiler
Rebuilding a rear arch and ash wall
Recasting boiler door with refractory castable
Refractory castable, Stock ceramic blankets and Fire bricks in all shapes and sizes
Recasted
Pet incinerator door
Fit and supply
Pizza ovens
Bending, rolling and cutting.
Steel fabrication and manipulation
Lagging and cladding work on all pipes, hot or cold.
Cladding on Boiler
Removal of old refractory, repairing to replace old refractory material with new
Setting up to recast secondary arch
Rebuilding a secondary chamber in incinerator
Supplying and fitting of Pizza ovens
Project complete
Incinerator
Removal of Valves
Boiler
Lagging complete on Turbo pipe in an engine room of ship
Refractory work
Rear ring build in a boiler
Removal of Stocker mat to be overhauled
Refractory work
Recasted door opening
Rebuilding Cremation oven Icsa
Servicing
of Boiler
Tube cleaning
of a boiler
Welding
Installing Stainless steel lines
Welding works
Breaking out old refractory material and preparing for new material
Building Hydraulic pusher for incinerator
Completed and Fitted
New refractory materials installed in Cremation oven
Inspection on Tuber of boiler
Cremation furnace, complete rebuild with new refractory materials
WWE
recasting roof in cremation furnace
Rebuild a complete Killan with new refractory in Madagascar
Rebuild of Furnace and recasted floor of furnace
Pipe work installation of water line
Recasted an Ignition arch for boiler
Removal and overhaul of Stocker mat
Complete rebuild of a Furnace with new refractory material
Rebuild of Steel lobster for a boiler
Furnace rebuild
Welding inspection
Workshop for steel fabrication
Recasting burner quarl in a boiler
Breaking out cremation furnace
Rebuilding the cremation furnace
Water wash Tube cleaning
Overall Stocker Mats
Changing new Rods
Drive links and Side links
Common links